RESOURCES — WHAT'S INCLUDED

In the rate.
On your site.

Rental pricing only works if both sides know exactly where the line is. Here is the line — drawn before the proposal stage, not after.

  • IN THE RATE08 ITEMS
  • SITE READINESS06 ITEMS
  • HIDDEN FEESZERO
(01) THE SPLIT

IN THE RATE — ARR'S PROBLEM

  • ROBOT AND END-EFFECTOR
  • PROGRAMMING AND COMMISSIONING
  • INTEGRATION SUPPORT
  • WEEKLY PERFORMANCE REVIEWS
  • PREVENTIVE MAINTENANCE
  • SPARE PARTS SUPPORT
  • OPERATOR TRAINING
  • 24/7 BREAKDOWN RESPONSE PATHWAY

SITE READINESS — YOURS

  • × FREIGHT TO SITE
  • × POWER SUPPLY UPGRADES
  • × COMPRESSED AIR INFRASTRUCTURE
  • × FACILITY MODIFICATIONS
  • × CONSUMABLES SUCH AS GRIPPER PADS
  • × INTERNET CONNECTIVITY

Every site item is confirmed on the site visit before anything is signed — never discovered mid-deployment.

WANT THE NUMBERS FOR YOUR LINE?

Get the rate, spelled out.